Real estate / proptechStudied

Commercial lease → key terms

The break penalty isn't in the doc, so it's nulled and flagged, not invented.

Open the live lab · preloaded to this scenario

Structured Output Reliability Gate

Context

A commercial lease is parsed for rent, escalations, and the break option. The break penalty references 'Exhibit D, amount to be determined'; the first pass invents a number, and the gate forces it to null and flag for legal review instead.

The decision

Null and flag beats hallucinate: any value not present in the document is set null and routed to legal, never guessed, because a confident wrong number is worse than an honest blank.

What most miss

Extraction demos reward filling every field. On legal docs the disciplined move is leaving a field null when the source defers it, a fabricated penalty is a liability, not a convenience.

Stakes

An invented lease term that reaches an abstract or a model is a legal and valuation error carried downstream.

Takeaway · If it isn't in the document, null it and flag it, a confident wrong number is worse than a blank.

Studied · Agent Architecture and Protocol Strategy Artifacts · verified 2026-07-03

Sources: Commercial-lease abstraction (rent, escalations, break options); Extraction hallucination controls (null-and-flag over invent)

← All industries·See it in a full program storyline →